Start of work on the Cultural Center of Poljane

10. Nov 2022
After signing the contract with the client Municipality of Gorenje vas-Poljane, we started work on the new Cultural Center in Poljane.

The construction of the existing facility dates back to 1940, and with a minor addition in 2000, it is the largest facility in Poljane. The removal of the existing multi-purpose building of the Cultural Center and the new construction of a new modern multi-purpose building of a modern cultural center with a multi-purpose hall, a small multi-purpose hall, a cafe, a local library and the premises of KS Poljana are planned. The multipurpose building is designed from the ground floor, 1st and 2nd floors and attic. The facade envelope has a contact facade, over which a wooden panel, made of vertical slats made of larch wood, is installed at regular intervals on the 1st and 2nd floors and on the attic.

Top